Construction Progress - 8 October 2021
At the construction site in October, the steel frame assembly and floor concreting up to the third floor is almost complete, and work on the electrical, air conditioning, water supply and drainage systems is in progress. The installation of some windows has also begun. The interior of the building is quite spacious, with high ceilings (about 5 meters) and a view of the school building, campus, and rich nature from the second and third floors of the residence halls.
From now on, the interior and exterior work will be in full swing. We'll keep you updated on the progress, so stay tuned!
If you are interested in actually seeing the construction site, please consider attending the Open Campus. You can also take a virtual campus tour of the dormitory here.