建設の進捗状況 - 2022年3月21日
1階は各所の壁床仕上げが進んでおり、食堂奥にはメールボックスも設置されました。2階の多目的スペースに設置したアイランドキッチンは、近日中に水が出るよう調整を進めています。このキッチンは、ケトル用コンセントとシンク、収納がついています。外構は東側の車寄せ付近のアスファルト舗装工事を開始しています。
個別の学校訪問は随時受け付けております。
お申し込み、お問合せは下記まで。https://ic.nucba.ac.jp/jp/request/
関連記事
-
Construction Progress - 7 March 2022
- Dormitory
The installation of the glass eaves at the entrance is now complete. On the second floor, the walls and floor of the corridor are just about to be finished while in the lounge on the first floor, a...
The installation of the glass eaves at the entrance is now complete. On the second floor, the walls and floor of the corridor are just about to be finished while in the lounge on the first floor, a...
-
Construction Progress - 28 February 2022
- Dormitory
The first floor of the dormitory (men's area) has been completed and the floor finishing on the third floor (women's area) is underway. In addition, the staircase's foundation from the courtyard to...
The first floor of the dormitory (men's area) has been completed and the floor finishing on the third floor (women's area) is underway. In addition, the staircase's foundation from the courtyard to...
-
Construction Progress - 21 February 2022
- Dormitory
On the group floor, light fittings have been installed in the cafeteria and the walls are currently being painted. The glass partitions between the Administration office and the study rooms located...
On the group floor, light fittings have been installed in the cafeteria and the walls are currently being painted. The glass partitions between the Administration office and the study rooms located...
-
Construction Progress - 15 February 2022
- Dormitory
Construction remains very much on schedule for April 2022 completion. The dormitory rooms on the 2nd floor is in the final stages of construction and is nearing completion. We are always happy to a...
Construction remains very much on schedule for April 2022 completion. The dormitory rooms on the 2nd floor is in the final stages of construction and is nearing completion. We are always happy to a...
-
Construction Progress - 31 January 2022
- Dormitory
For this first report of the year, we are extremely proud to show you the impressive progress on the construction worksite. There are only 3 months left before the completion of the building and th...
For this first report of the year, we are extremely proud to show you the impressive progress on the construction worksite. There are only 3 months left before the completion of the building and th...
-
Construction Progress - 21 December 2021
- Dormitory
It is a pleasure to share with you today the latest pictures of our boarding house construction work, and for the first time, the inside of our School building. Only 4 months to go to see the compl...
It is a pleasure to share with you today the latest pictures of our boarding house construction work, and for the first time, the inside of our School building. Only 4 months to go to see the compl...